Cement Mill in 300tpd cement production line

Cement Mill in 300tpd cement production line
Product Detailed
Related Categories:Cement Making Machinery
Cement mill -Used after cement kiln -Grind hard nodular clinker into the fine grey powder -100,000tpy cement production line

1. Introduction of Cement mill in cement production line

cement mill is the equipment used to grind the hard, nodular clinker from the cement kiln into the fine grey powder that is cement. Most cement is currently ground in ball mills.Cement mill is normally driven by electric motors.The output achieved by a cement mill system varies with the mill power, the fineness of the product and the hardness of the clinker.

2. Application of Cement ball Mill:

In the technics of Cement production process, People usually choose limestones and clays as the main raw materials, crushing, concocting, grinding them into cement raw meal, feeding them into cement kiln,Cement clinker is usually ground using a ball mill.After being calcined maturity, adding appropriate amount of gypsum (sometimes mixing the mixed material or admixture) then being grinded, and the cements form.

A, crushing and pre-homogenization

B, The prepare and homogenization of cement raw meals

C, pre-decomposition and the burning of cement clinker

D, cement grinding

E, cement packing and transport

The cement manufacturing process consists of many simultaneous and continuous operations using some of the largest moving machinery in manufacturing.

 3. Technical Parameters of Cement Ball Mill:

Model(m)

Capacity(t/h)

Form of mill

Form of transmission

Power(kw)

Reduction drive

Weight(t)

Type

Rate

2.2x7m

8-9

open grinding system

brim

380

ZD70

5

54

2.2x7.5m

10-11

open grinding system

brim

380

ZD70

5

63

2.2x8m

10-12

open grinding system

brim

380

ZD70

5

65

2.2x9m

14-16

open grinding system

brim

475

ZD70

5

70

2.4x10m

19-19

open grinding system

brim

630

JR75

5.64

94.5

2.4x11m

19-21

open grinding system

brim

630

RZD80

6.3

99.2

2.4x13m

21-23

open grinding system

brim

800

MBY710

7.1

115.2

2.6x13m

28-32

open grinding system

brim

1000

MBY800

7.1

148

2.6x13m

28-32

open grinding system

center

1000

MFY100

19.5

101.73

3x12m

32-35

open grinding system

brim

1250

MBY900

7.1

168.6

3x13m

34-37

open grinding system

brim

1400

MBY900

7.1

172.26

3.2x13m

45-50

open grinding system

brim

1600

MBY1000

7.1

196.26

3.8x13m

60-62

open grinding system

center

2500

MFY250

16.5

204

4.2x13m

85-87

open grinding system

center

3530

JQS3550

15.6

254

 Note: the above technical parameters are just for reference, if you want to get more detailed information or if you have any trouble in selecting the suitable machine, please contact us.